logo
ProjectPlanning Schematics

Anderson Line Subdivision - Coldwater

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Dodge USA

Develop a 42 residential lots. A single new roadway of approximately 300 metres in length, extending from Anderson Line, will provide access to the proposed subdivision, terminating with a cul-de-sac near the proposed retirement facility. The residential lots along the northern half of the subject lands are all approximately 800m² in size, the have a minimum frontage of 14 metres. The residential

Status
Prospective
Sector
Hospital, Residential, Commercial, Hotel, Waste Processing and Treatment, Water Supply and Storage
Location
Coldwater, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Anderson Line Subdivision - Coldwater

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Anderson Line Subdivision - Coldwater” is an infrastructure initiative in the Hospital sector, located in Coldwater, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Develop a 42 residential lots. A single new roadway of approximately 300 metres in length, extending from Anderson Line, will provide access to the proposed subdivision, terminating with a cul-de-sac near the proposed retirement facility. The residential lots along the northern half of the subject lands are all approximately 800m² in size, the have a minimum frontage of 14 metres. The residential lots along the southern half of the lands will have lot areas of approximately 600m², as with a...

Budget

Location

Country

Canada

State

Ontario

City

Coldwater

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hospital, Residential, Commercial, Hotel, Waste Processing and Treatment, Water Supply and Storage

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project