logo
ProjectPre-Design

Androscoggin River Bike Path Extension Phase 1

One of 9,133 projects Taiyo tracks in Maine.

Source: Dodge USA

This project serves to supplement Androscoggin River Bike Path Extension CIP item Sections VI & VII. The project will connect the Androscoggin River Bike Path to Cooks corner, the proposed scope of work would include: Phase 1A 6-foot wide sidewalk on Grover Lane from the terminus of the bike path to Old Bath Road 10-foot wide multi-use path on Old Bath Road from Maplewood Manor to Old Bath Road Br

Status
Prospective
Sector
Commercial, Car parking, Bridge, Road, Government, Automotive
Location
Brunswick, Maine, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Androscoggin River Bike Path Extension Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Androscoggin River Bike Path Extension Phase 1” is an infrastructure initiative in the Commercial sector, located in Brunswick, Maine, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This project serves to supplement Androscoggin River Bike Path Extension CIP item Sections VI & VII. The project will connect the Androscoggin River Bike Path to Cooks corner, the proposed scope of work would include: Phase 1A 6-foot wide sidewalk on Grover Lane from the terminus of the bike path to Old Bath Road 10-foot wide multi-use path on Old Bath Road from Maplewood Manor to Old Bath Road Bridge Phase 1B Pedestrian Bridge over Route 1 adjacent to the Old Bath Road Bridge 10-foot wide mu...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maine

City

Brunswick

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Car parking, Bridge, Road, Government, Automotive

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project