Angat Water Transmission Improvement Project
One of 10,000+ projects Taiyo tracks in Philippines.
Source: Asian Development Bank (ADB)
The Project will secure raw water supply to the 13 million inhabitants of Metropolitan Waterworks and Sewerage System (MWSS) service area, through the rehabilitation of the Angat transmission line. It is estimated that currently each day about 800,000 m3 or 20% of the total potential capacity of raw water is lost , due to leakage of the aqueducts . The main components of the Angat transmission lin
- Status
- Closed
- Sector
- Mass Transit, Water Supply and Storage, Residential, Commercial, Government
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Angat Water Transmission Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project will secure raw water supply to the 13 million inhabitants of Metropolitan Waterworks and Sewerage System (MWSS) service area, through the rehabilitation of the Angat transmission line. It is estimated that currently each day about 800,000 m3 or 20% of the total potential capacity of raw water is lost , due to leakage of the aqueducts . The main components of the Angat transmission line are as old as 50 years, in poor condition, and not in compliance with structural and seismic requirements, risking the partial interruption of Metro Manila's water supply. The impact of the Project is sustained and secured water supply from the Angat reservoir. The outcome is the sustained operation of the aqueducts, to be achieved by (i) retrofitting, rehabilitating and/or re-construction of the aqueducts; and (ii) operationalization of an integrated water safety, risk- and asset management plan.The Project will finance the (i) rehabilitation and/or reconstruction of the aqueducts, and (ii) technical assistance to (a) assess structural and seismic integrity of the transmission system; (b) prepare water safety, risk- and asset management plans, covering the optimization of the system; (c) prepare designs of structural and non-structural measures to support the implementation of these plans; and (d) prepare subsequent investments. These investments may include rehabilitation and retrofitting of intakes, stilling basins and the remaining aqueducts. |
Original sector | Water and other urban infrastructure and services |
Procurement method | |
Budget |
Location
Country | Philippines |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Water Supply and Storage, Residential, Commercial, Government |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
