Angat Water Transmission Improvement Project
Sector: Mass Transit • Location: Philippines
Source: Asian Development Bank (ADB)
The Project will secure raw water supply to the 13 million inhabitants of Metropolitan Waterworks and Sewerage System (MWSS) service area, through the rehabilitation of the Angat transmission line. It is estimated that currently each day about 800,000 m3 or 20% of the total potential capacity of raw water is lost , due to leakage of the aqueducts . The main components of the Angat transmission lin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project will secure raw water supply to the 13 million inhabitants of Metropolitan Waterworks and Sewerage System (MWSS) service area, through the rehabilitation of the Angat transmission line. It is estimated that currently each day about 800,000 m3 or 20% of the total potential capacity of raw water is lost , due to leakage of the aqueducts . The main components of the Angat transmission line are as old as 50 years, in poor condition, and not in compliance with structural and seismic requirements, risking the partial interruption of Metro Manila's water supply. The impact of the Project is sustained and secured water supply from the Angat reservoir. The outcome is the sustained operation of the aqueducts, to be achieved by (i) retrofitting, rehabilitating and/or re-construction of the aqueducts; and (ii) operationalization of an integrated water safety, risk- and asset management plan.The Project will finance the (i) rehabilitation and/or reconstruction of the aqueducts, and (ii) technical assistance to (a) assess structural and seismic integrity of the transmission system; (b) prepare water safety, risk- and asset management plans, covering the optimization of the system; (c) prepare designs of structural and non-structural measures to support the implementation of these plans; and (d) prepare subsequent investments. These investments may include rehabilitation and retrofitting of intakes, stilling basins and the remaining aqueducts. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
