Angola - Energy sector efficiency and expansion programme (ESEEP) - Phase I
Sector: Commercial • Location: Angola
Source: African Development Bank (AfDB)
The Energy Sector Efficiency and Expansion Programme Phase 1 (ESEEP I) is designed to strengthen Angola's power transmission and distribution system. It’s structured around three components: (i) Construction of a 343 km long 400kV Central-South transmission line; (ii) Revenue improvement through installation of prepaid meters; and (iii) Program management for project design and implementation. The
- Sector
- Commercial, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Geothermal, Government
- Location
- Angola
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Angola - Energy sector efficiency and expansion programme (ESEEP) - Phase I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Energy Sector Efficiency and Expansion Programme Phase 1 (ESEEP I) is designed to strengthen Angola's power transmission and distribution system. It’s structured around three components: (i) Construction of a 343 km long 400kV Central-South transmission line; (ii) Revenue improvement through installation of prepaid meters; and (iii) Program management for project design and implementation. The program will reinforce the operational capacity of the Angolan power distribution utility (ENDE) while increasing the wheeling capacity of the transmission system countrywide. The programme will help to: (i) reduce dependence on fossil fuels and lower the costs of electricity generation; and (ii) improve the reliability of national power systems and better cope with peak loads. The existing customer base of 1.374 million customers will benefit from more reliable and efficient service. The southern provinces of the country, most affected by the war, are supplied with electricity by systems operated in isolation and fuelled by expensive diesel fuel when the hydroelectric capacity of the northern power grid is not only in excess, but at low cost. ESEEP I intends to address this anomaly. The country would also have the opportunity to replace existing expensive thermal power plants and thereby reduce the cost of electricity generation. |
Original sector | Energy |
Budget |
Location
Country | Angola |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Angola
- Angola - Fisheries Sector Support Project
- Port of Luanda Multipurpose Terminal (MPT)
- Angola - Support to the Socio-economic Reintegration of Vulnerable Groups in Angola
- Barloworld Equipamentos Angola Limitada
- Lauca Hydroelectric Project
- Aceria de Angola SA
- Cambambe Hydroelectric Project-Phase II
- Luapasso Mini Hydropower Plant
