Angola - Energy sector efficiency and expansion programme (ESEEP) - Phase I

Sector: Commercial • Location: Angola

Source: African Development Bank (AfDB)

The Energy Sector Efficiency and Expansion Programme Phase 1 (ESEEP I) is designed to strengthen Angola's power transmission and distribution system. It’s structured around three components: (i) Construction of a 343 km long 400kV Central-South transmission line; (ii) Revenue improvement through installation of prepaid meters; and (iii) Program management for project design and implementation. The

Sector
Commercial, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Geothermal, Government
Location
Angola
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Angola - Energy sector efficiency and expansion programme (ESEEP) - Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Angola - Energy sector efficiency and expansion programme (ESEEP) - Phase I” is an infrastructure initiative in the Commercial sector, located in Angola. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Energy Sector Efficiency and Expansion Programme Phase 1 (ESEEP I) is designed to strengthen Angola's power transmission and distribution system. It’s structured around three components: (i) Construction of a 343 km long 400kV Central-South transmission line; (ii) Revenue improvement through installation of prepaid meters; and (iii) Program management for project design and implementation. The program will reinforce the operational capacity of the Angolan power distribution utility (ENDE) while increasing the wheeling capacity of the transmission system countrywide. The programme will help to: (i) reduce dependence on fossil fuels and lower the costs of electricity generation; and (ii) improve the reliability of national power systems and better cope with peak loads. The existing customer base of 1.374 million customers will benefit from more reliable and efficient service. The southern provinces of the country, most affected by the war, are supplied with electricity by systems operated in isolation and fuelled by expensive diesel fuel when the hydroelectric capacity of the northern power grid is not only in excess, but at low cost. ESEEP I intends to address this anomaly. The country would also have the opportunity to replace existing expensive thermal power plants and thereby reduce the cost of electricity generation.

Original sector

Energy

Budget

Location

Country

Angola

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Geothermal, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project