Angola - Energy sector efficiency and expansion programme (ESEEP) - Phase I
Sector: Commercial • Location: Angola
Source: African Development Bank (AfDB)
The Energy Sector Efficiency and Expansion Programme Phase 1 (ESEEP I) is designed to strengthen Angola's power transmission and distribution system. It’s structured around three components: (i) Construction of a 343 km long 400kV Central-South transmission line; (ii) Revenue improvement through installation of prepaid meters; and (iii) Program management for project design and implementation. The
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Energy Sector Efficiency and Expansion Programme Phase 1 (ESEEP I) is designed to strengthen Angola's power transmission and distribution system. It’s structured around three components: (i) Construction of a 343 km long 400kV Central-South transmission line; (ii) Revenue improvement through installation of prepaid meters; and (iii) Program management for project design and implementation. The program will reinforce the operational capacity of the Angolan power distribution utility (ENDE) while increasing the wheeling capacity of the transmission system countrywide. The programme will help to: (i) reduce dependence on fossil fuels and lower the costs of electricity generation; and (ii) improve the reliability of national power systems and better cope with peak loads. The existing customer base of 1.374 million customers will benefit from more reliable and efficient service. The southern provinces of the country, most affected by the war, are supplied with electricity by systems operated in isolation and fuelled by expensive diesel fuel when the hydroelectric capacity of the northern power grid is not only in excess, but at low cost. ESEEP I intends to address this anomaly. The country would also have the opportunity to replace existing expensive thermal power plants and thereby reduce the cost of electricity generation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
