Angola - Energy sector efficiency and expansion programme (ESEEP) - Phase I

Sector: Commercial • Location: Angola

Source: African Development Bank (AfDB)

Project

The Energy Sector Efficiency and Expansion Programme Phase 1 (ESEEP I) is designed to strengthen Angola's power transmission and distribution system. It’s structured around three components: (i) Construction of a 343 km long 400kV Central-South transmission line; (ii) Revenue improvement through installation of prepaid meters; and (iii) Program management for project design and implementation. The

Project Information FAQ

Project Information

4 Q
The project “Angola - Energy sector efficiency and expansion programme (ESEEP) - Phase I” is an infrastructure initiative in the Commercial sector, located in Angola. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Energy Sector Efficiency and Expansion Programme Phase 1 (ESEEP I) is designed to strengthen Angola's power transmission and distribution system. It’s structured around three components: (i) Construction of a 343 km long 400kV Central-South transmission line; (ii) Revenue improvement through installation of prepaid meters; and (iii) Program management for project design and implementation. The program will reinforce the operational capacity of the Angolan power distribution utility (ENDE) while increasing the wheeling capacity of the transmission system countrywide. The programme will help to: (i) reduce dependence on fossil fuels and lower the costs of electricity generation; and (ii) improve the reliability of national power systems and better cope with peak loads. The existing customer base of 1.374 million customers will benefit from more reliable and efficient service. The southern provinces of the country, most affected by the war, are supplied with electricity by systems operated in isolation and fuelled by expensive diesel fuel when the hydroelectric capacity of the northern power grid is not only in excess, but at low cost. ESEEP I intends to address this anomaly. The country would also have the opportunity to replace existing expensive thermal power plants and thereby reduce the cost of electricity generation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data