Anhanguera Small Power Plant

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Sociedade de Energia Bandeirantes (SEBAND) was granted an authorization to build a 22.68-MW small hydro power plant in the state of Sao Paulo (Sapucai river, municipality of Sao Joaquim da Barra and Guara). The 30-year contract was signed with the regulatory agency ANEEL in October 2002. In 2003, the sponsor along with its parent company Pleuston Servicos Ltda (which held 62.

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Anhanguera Small Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Anhanguera Small Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Sociedade de Energia Bandeirantes (SEBAND) was granted an authorization to build a 22.68-MW small hydro power plant in the state of Sao Paulo (Sapucai river, municipality of Sao Joaquim da Barra and Guara). The 30-year contract was signed with the regulatory agency ANEEL in October 2002. In 2003, the sponsor along with its parent company Pleuston Servicos Ltda (which held 62.5% of SEBAND’s shares) created the company Central Eletrica Anhanguera (CELAN) to lead the project. In March 2009, the company Volkswagen do Brasil S.A. acquired shares of CELAN from SEBAND, such that the ownership structure of the company by the end of the year was as follows: Volkswagen (40%), SEBAND (33%) and Pleuston (27%). CELAN committed to invest US$ 50 million (BRL 100 million) in the construction of PCH Anhaguera. Though the construction works commenced in 2008, financial closure was only achieved in June 2009, when CELAN was granted a US$ 36.3 million (BRL 72.5 million) loan from the state-owned bank BNDES. As of 2009, operation of the facility was expected to commence in the second semester of 2010.In December 2010, the power plant commenced operations.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project