logo

Anhui Xuancheng Infrastructure for Industry Relocation

Sector: Road • Location: China

Source: World Bank

Project
Closed

The objective of the Anhui Xuancheng Infrastructure for Industry Relocation Project for China is to contribute to the economic, social and environmental sustainability of the project area in the Xuancheng economic and technological development zone. There are three components to the project, the first component being roads and bridges with underground storm-water drainage networks, water supply ne

Project Information FAQ

Project Information

5 Q
The project “Anhui Xuancheng Infrastructure for Industry Relocation” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Anhui Xuancheng Infrastructure for Industry Relocation Project for China is to contribute to the economic, social and environmental sustainability of the project area in the Xuancheng economic and technological development zone. There are three components to the project, the first component being roads and bridges with underground storm-water drainage networks, water supply networks, and sewerage networks. This component supports the construction of selected urban roads in the project area, along with bus stations and stops, landscaping, and associated sub-surface infrastructure services, including storm water drainage, water supply and sewage networks. The second component is the wastewater conveyance, treatment and discharge. This component supports construction of conveyance sewers and treated effluent pipes to and from the wastewater treatment plant, as well as construction of associated treated effluent outfalls. Finally, the third component is the institutional development and capacity building.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data