logo

Anillo Vial Periférico: Transforming Lima's Urban Road Infrastructure

Sector: Airport • Location: Peru

Source: Inter-American Development Bank (IADB)

Project
Hold

The Project, which involves the construction, operation, and maintenance of a 34.8 km long, six lane, toll expressway in Lima, Peru, will also include toll-free side roads for local traffic, 4.22 km of double and triple lane tunnels, 11 viaducts, 16 underpasses, 18 overpasses, pedestrian crossings every 500 m, 3 main toll stations, and two lateral toll stations. Once in operation, it is expected t

Project Information FAQ

Project Information

5 Q
The project “Anillo Vial Periférico: Transforming Lima's Urban Road Infrastructure” is an infrastructure initiative in the Airport sector, located in Peru. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

hold

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project, which involves the construction, operation, and maintenance of a 34.8 km long, six lane, toll expressway in Lima, Peru, will also include toll-free side roads for local traffic, 4.22 km of double and triple lane tunnels, 11 viaducts, 16 underpasses, 18 overpasses, pedestrian crossings every 500 m, 3 main toll stations, and two lateral toll stations. Once in operation, it is expected to (i) significantly reduce traffic congestion in Lima by diverting heavy vehicles from the oversaturated existing grid, (ii) improve the connectivity between the airport, port, and other national highways, and (iii) benefit over 4.5 million people.For construction purposes, the Project has been divided in three stretches (“Tramo”): Tramo 1, which is 8.7 km long, extends through El Callao, San Martín de Porres, and Los Olivos, from the Ovalo de las 200 miles to the Panamericana Norte, at the Ovalo del Naranjal; Tramo 2, with a total length of 15.1 km, that stretches through Independencia, Comas, San Juan de Lurigancho, and Lurigancho-Chosica to the Avenida Ramiro Prialé; and Tramo 3, a 11.0 km section, that extends through El Agustino, Santa Anita, La Molina, and San Luis to Avenida Rosa Toro, 70 m past Avenida Circunvalación.Each Tramo will progress through three phases: pre-construction, expected to take 1.5 to 5 years, will focus on securing rights of way, including land acquisition and relocation; construction, foreseen to last 7 years, will comprise both of greenfield and brownfield works; and operation that will extend for a minimum of 30 years.The Project will involve the acquisition of 653 governmental and 3,487 privately-owned properties and require the resettlement of approximately 3,399 social units (38 in Tramo 1; 3,216 in Tramo 2; and 145 in Tramo 3).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data