Anita St Sewer Lift Station Beach Access Stairs Reconst
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
In general, the WORK of this Contract will consist of relocating the existing 70kW emergency natural gas generator to a new location, installed in a new below grade CIP concrete vault, and an above grade electrical/control building, installation of a new below ground submersible style sewer lift station and valve vault, demolition of the existing lift station and site features, and rehabilitation/
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Natural Gas, Cement, Consumer Products, Waste Processing and Treatment, Power Generation (CCGT), Road, Commercial
- Location
- Laguna Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Anita St Sewer Lift Station Beach Access Stairs Reconst
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the WORK of this Contract will consist of relocating the existing 70kW emergency natural gas generator to a new location, installed in a new below grade CIP concrete vault, and an above grade electrical/control building, installation of a new below ground submersible style sewer lift station and valve vault, demolition of the existing lift station and site features, and rehabilitation/reconstruction of the Anita Street beach access stairs, including ALL general civil site improvem... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Laguna Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Natural Gas, Cement, Consumer Products, Waste Processing and Treatment, Power Generation (CCGT), Road, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
