Anji County Solid Waste Power Plant
Sector: Biomass • Location: China
Source: World Bank Group
In 2010, a local private company Mizuda Group signed an agreement with the Anji County Government to build and operate a solid waste power plant in Anji County, Huzhou City, Zhejiang Province. In Nov 2010, construction commenced. The capacity of the project was 4.5MW and total investment was RMB 130 million (US$ 19.20 million). The plant could process 300 tons of household solid waste per day. The
- Status
- Prospective
- Sector
- Biomass, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government, Water Supply and Storage
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Anji County Solid Waste Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 2010, a local private company Mizuda Group signed an agreement with the Anji County Government to build and operate a solid waste power plant in Anji County, Huzhou City, Zhejiang Province. In Nov 2010, construction commenced. The capacity of the project was 4.5MW and total investment was RMB 130 million (US$ 19.20 million). The plant could process 300 tons of household solid waste per day. The facility came into operation in Nov 2011. Mizuda had a 100% stake in the project. The concession term of the agreement was not reported. At least 25% of construction had been achieved by Mar 2011. |
Original sector | Municipal Solid Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government, Water Supply and Storage |
Article published date | 2024-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in China
- Baoying Waste-to-Energy plant
- Jiangsu Zhangjiagang Solid Waste Integrated Treatment Plant
- Shandong Yucheng Waste-to-energy Plant Phase I
- Shandong Weishan Waste-to-Energy plant
- Jinzhai Kaidi Biomass Power Plant
- Rudong Biomass Pellet Facilities
- Lingbi Biomass plant
- Sanitary Landfill in Sanshui District of Foshan City
