Anji Rail Bridge
The status, timeline and source of this project. A free account opens every field.
Source: News24
The Anji Rail Bridge is India's first cable-stayed rail route, constructed in the Reasi area of Jammu and Kashmir. It is part of the Udampur-Srinagar-Baramulla-Rail Link Project and features a main pylon standing at 193 meters high, with a total bridge length of 725.5 meters.
- Status
- Under Construction
- Sector
- Rail, Bridge, Road, Mass Transit
- Location
- Jammu and Kashmir, India
- Updated
- 22 Jul 2026
- Source
- News24
ConstructChat
Ask ConstructChat about Anji Rail Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Anji Rail Bridge is India's first cable-stayed rail route, constructed in the Reasi area of Jammu and Kashmir. It is part of the Udampur-Srinagar-Baramulla-Rail Link Project and features a main pylon standing at 193 meters high, with a total bridge length of 725.5 meters. |
Original sector | Transportation |
Location
Country | India |
State | Jammu and Kashmir |
Source
Source | News24 |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Road, Mass Transit |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
