Anji Rail Bridge
Sector: Bridge • Location: Reasi, Jammu and Kashmir, India
Source: India Today
The Anji Bridge is India's first cable-stayed rail bridge, spanning 473 metres across the Anji river, a tributary of the Chenab. It is part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project and is designed to withstand the region's challenging terrain and seismic activity. The bridge features a single pylon rising 331 meters and 96 cables supporting the deck, enhancing connectivity to t
- Status
- Closed
- Sector
- Bridge, Rail, Government, Mass Transit, Warehouse
- Location
- Reasi, Jammu and Kashmir, India
- Updated
- 22 Jul 2026
- Source
- India Today
ConstructChat
Ask ConstructChat about Anji Rail Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Anji Bridge is India's first cable-stayed rail bridge, spanning 473 metres across the Anji river, a tributary of the Chenab. It is part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project and is designed to withstand the region's challenging terrain and seismic activity. The bridge features a single pylon rising 331 meters and 96 cables supporting the deck, enhancing connectivity to the Kashmir Valley and improving trade, travel, and defence logistics. |
Original sector | Transportation |
Budget |
Location
Country | India |
State | Jammu and Kashmir |
City | Reasi |
Source
Source | India Today |
URL |
More Details
Record type | Project |
Sector | Bridge, Rail, Government, Mass Transit, Warehouse |
Article published date | 2025-06-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
