logo

Anna Maria WaterMain Replacement Phases 42 43 46 & 53

Sector: Metal • Location: Bradenton, Florida, United States of America

Source: Dodge USA

Project
Closed

Replacement of 2 inch and 3 inch galvanized pipe and 4 inch and 6 inch unlined cast iron pipe with 6 inch or 8 inch poly vinyl chloride (PVC) pipe and appurtenances.

Status
Closed
Sector
Metal, Government, Waste Processing and Treatment, Steel, Commercial, Water Supply and Storage
Location
Bradenton, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Anna Maria WaterMain Replacement Phases 42 43 46 & 53

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Anna Maria WaterMain Replacement Phases 42 43 46 & 53” is an infrastructure initiative in the Metal sector, located in Bradenton, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of 2 inch and 3 inch galvanized pipe and 4 inch and 6 inch unlined cast iron pipe with 6 inch or 8 inch poly vinyl chloride (PVC) pipe and appurtenances.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Bradenton

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Government, Waste Processing and Treatment, Steel, Commercial, Water Supply and Storage

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project