Annie Walker Park Improvements
Pre-design · Nevada · Last reported Sep 2025
Source: Dodge
The CNLV SPARKLE Initiative intends to provide improvements to the parks located South of Craig Rd. These Southern parks were selected due to their age and general condition. Below is the list of scheduled improvements: Relocate Park sign to northeast corner, Re-landscape area around park sign to include trees, shrubs, boulders, lantana, and lighting: $25,000 Irrigation Update: $20,000 Replace bot
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Commercial, Government
- Location
- North Las Vegas, Nevada, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Annie Walker Park Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The CNLV SPARKLE Initiative intends to provide improvements to the parks located South of Craig Rd. These Southern parks were selected due to their age and general condition. Below is the list of scheduled improvements: Relocate Park sign to northeast corner, Re-landscape area around park sign to include trees, shrubs, boulders, lantana, and lighting: $25,000 Irrigation Update: $20,000 Replace both playground structures with new, and install swings (4): $350,000 Turf Renovation: $7,500 Prune ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | North Las Vegas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Road, Water Supply and Storage, Automotive, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
