ANTALYA WS & SANITATION
Closed · Turkey
Source: World Bank Group
The objectives of the Antalya Water Supply and Sanitation Project are to: a) meet at least cost the demand for water supply, sewerage and stormwater drainage; b) develop new institutional arrangements for management of municipal water supply, sewerage and stormwater drainage, and to introduce private sector participation in the operation of the services; c) implement appropriate cost recovery poli
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Hotel, Government
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ANTALYA WS & SANITATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Antalya Water Supply and Sanitation Project are to: a) meet at least cost the demand for water supply, sewerage and stormwater drainage; b) develop new institutional arrangements for management of municipal water supply, sewerage and stormwater drainage, and to introduce private sector participation in the operation of the services; c) implement appropriate cost recovery policies; d) postpone the need to develop costly new water resources by improving the efficiency of utilization of existing sources and of water usage by reducing the volume of non-revenue water which is presently too high; and e) improve and sustain environmental conditions and reduce health hazards that threaten the local population and the tourism industry. The project represents the first phase, to be implemented from 1995 throug 2002, of a program designed to continue to the year 2020. The project will: a) renovate, rehabilitate and extend the existing water supply network; b) provide a new sewerage network and a preliminary wastewater treatment plant on the western part of the municipality; c) improve operation of septic tanks in the eastern part of the city; d) upgrade the stormwater drainage system in flood areas and elaborate a comprehensive master plan; and e) provide technical assistance for project implementation and institutional development. |
Original sector | FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management,Water, Sanitation and Waste Management |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Hotel, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
