Antelope Valley Battery Energy Storage System (BESS)
Sector: Energy Storage • Location: Kern County, California, United States
Source: Business Wire
A 126-megawatt (MW) / 504 megawatt-hour (MWh) stand-alone battery energy storage system facility in Kern County, California. It is the first grid-connected, stand-alone battery project by Leeward Renewable Energy and aims to strengthen grid reliability in California.
- Status
- Closed
- Sector
- Energy Storage, Residential
- Location
- Kern County, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Business Wire
ConstructChat
Ask ConstructChat about Antelope Valley Battery Energy Storage System (BESS)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 126-megawatt (MW) / 504 megawatt-hour (MWh) stand-alone battery energy storage system facility in Kern County, California. It is the first grid-connected, stand-alone battery project by Leeward Renewable Energy and aims to strengthen grid reliability in California. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | California |
City | Kern County |
Source
Source | Business Wire |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Residential |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States
- Tampa Bay Seawater Desalination Plant
- Centrally Managed Pay-and-Display Parking
- Chevron Richmond Refinery
- Nestle Food and Distribution Centre, USA
- Pepperidge Farm Bakery Plant
- Baldock Solar Highway
- Doyle Drive Replacement / Presidio Parkway, San Francisco, US
- Newtown Creek (35-G) North and North Central Batteries
