Anthony Munoz Concession Building Renovation
Closed · California · Last reported Dec 2024
Source: Dodge USA
The City intends to renovate the concession kitchen and the restrooms of the Anthony Munoz Park Concession Building. The scope will include new countertops, lighting, kitchen prep sink installation, install new oven/range, upgrade wiring to existing range hood, interior painting and floor coverings. Restroom scope will include new lighting, partitions, toilets and urinals, new fixture valves, floo
- Status
- Closed
- Sector
- Metal, Consumer Products, Government, Raw Materials, Car parking, Commercial, Automotive
- Location
- Ontario, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Anthony Munoz Concession Building Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City intends to renovate the concession kitchen and the restrooms of the Anthony Munoz Park Concession Building. The scope will include new countertops, lighting, kitchen prep sink installation, install new oven/range, upgrade wiring to existing range hood, interior painting and floor coverings. Restroom scope will include new lighting, partitions, toilets and urinals, new fixture valves, floor coatings and interior paint and pointing of entrance metal security doors. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Ontario |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Consumer Products, Government, Raw Materials, Car parking, Commercial, Automotive |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
