Antonio Guiteras Thermal Power Plant Synchronization
Sector: Power Generation (CCGT) • Location: Matanzas, Cuba
Source: CiberCuba
The Antonio Guiteras Thermal Power Plant in Matanzas successfully synchronized with the National Electrical System (SEN) on February 8, 2025, after undergoing repairs and tests. The plant aims to increase its output to 220 MW to meet peak demand, following a period of disconnection and uncertainty regarding its operational stability.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Geothermal
- Location
- Matanzas, Cuba
- Updated
- 22 Jul 2026
- Source
- CiberCuba
ConstructChat
Ask ConstructChat about Antonio Guiteras Thermal Power Plant Synchronization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Antonio Guiteras Thermal Power Plant in Matanzas successfully synchronized with the National Electrical System (SEN) on February 8, 2025, after undergoing repairs and tests. The plant aims to increase its output to 220 MW to meet peak demand, following a period of disconnection and uncertainty regarding its operational stability. |
Original sector | Energy |
Location
Country | Cuba |
State | Matanzas |
City | Matanzas |
Source
Source | CiberCuba |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
