Anuriqjuak Nukkiksautiit Project (ANP)
The owner, status and timeline of this project. A free account opens every field.
Source: WindInsider
The project involves the installation of a 1-megawatt wind turbine and a 1 megawatt-hour energy storage system in Sanikiluaq, Nunavut. It aims to replace up to 70% of the community's diesel consumption for electricity, reducing greenhouse gas emissions and improving local energy security. The electricity generated will be sold to Qulliq Energy Corporation and integrated into the local grid.
- Status
- Closed
- Sector
- Wind, Energy Storage, Power Generation (CCGT), Government
- Location
- Sanikiluaq, Nunavut, Canada
- Updated
- 22 Jul 2026
- Source
- WindInsider
ConstructChat
Ask ConstructChat about Anuriqjuak Nukkiksautiit Project (ANP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the installation of a 1-megawatt wind turbine and a 1 megawatt-hour energy storage system in Sanikiluaq, Nunavut. It aims to replace up to 70% of the community's diesel consumption for electricity, reducing greenhouse gas emissions and improving local energy security. The electricity generated will be sold to Qulliq Energy Corporation and integrated into the local grid. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | Nunavut |
City | Sanikiluaq |
Source
Source | WindInsider |
URL |
More Details
Record type | Project |
Sector | Wind, Energy Storage, Power Generation (CCGT), Government |
Article published date | 2025-06-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
