Anuriqjuak Nukkiksautiit Project
Sector: Wind • Location: Sanikiluaq, Nunavut, Canada
Source: ReNew Canada
The Anuriqjuak Nukkiksautiit Project (ANP) is a clean energy initiative in the remote Inuit community of Sanikiluaq, Nunavut. It includes a 1-megawatt wind turbine and a 1 megawatt-hour energy storage system to replace up to 70% of the community's diesel use for electricity with renewable energy, reducing emissions and lowering electricity costs.
- Status
- Closed
- Sector
- Wind, Energy Storage, Power Generation (CCGT), Government
- Location
- Sanikiluaq, Nunavut, Canada
- Updated
- 22 Jul 2026
- Source
- ReNew Canada
ConstructChat
Ask ConstructChat about Anuriqjuak Nukkiksautiit Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Anuriqjuak Nukkiksautiit Project (ANP) is a clean energy initiative in the remote Inuit community of Sanikiluaq, Nunavut. It includes a 1-megawatt wind turbine and a 1 megawatt-hour energy storage system to replace up to 70% of the community's diesel use for electricity with renewable energy, reducing emissions and lowering electricity costs. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | Nunavut |
City | Sanikiluaq |
Source
Source | ReNew Canada |
URL |
More Details
Record type | Project |
Sector | Wind, Energy Storage, Power Generation (CCGT), Government |
Article published date | 2025-06-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
