logo

Anyang Municipal Waste Water Treatment Centre Phase I Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

The project comprises the first phase of the construction of Anyang municipal waste water treatment centre in Henan Province, China. The sponsor is a consortium, led by Everbright Water Limited, which signed a concession agreement for the project on 6 June, 2024. The concession period is 30 years, including the construction time. The investment is approximately $91.46m or RMB663 million. China Eve

Project Information FAQ

Project Information

4 Q
The project “Anyang Municipal Waste Water Treatment Centre Phase I Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the first phase of the construction of Anyang municipal waste water treatment centre in Henan Province, China. The sponsor is a consortium, led by Everbright Water Limited, which signed a concession agreement for the project on 6 June, 2024. The concession period is 30 years, including the construction time. The investment is approximately $91.46m or RMB663 million. China Everbright Water Limited holds 99% equity interest in the consortium. The plant will be financed, invested in, constructed, operated and maintained based on the BOT (Build-Operate-Transfer) model 99% by Everbright Water. The project tasks inlcude construction, operation and maintenance of a waste water treatment plant, which has a designed daily waste water treatment capacity of 100,000 m3 and a waste water pipeline network of 10.3 km in length. https://www.ebwater.com/en/media/press_each.php?file=p240606 ; https://doc.irasia.com/listco/hk/cewater/announcement/a240606a.pdf ; https://doc.irasia.com/listco/sg/cewater/announcement/attachments/CEWL_-_Entry_into_Concession_Agreement_for_Anyang_Municipal_WWT_Centre_Phase_I_Project_in_Henan_EN.pdf ; https://doc.irasia.com/listco/sg/cewater/announcement/a240606.pdf https://www.ebwater.com/en/media/press_each.php?file=p240606 ; https://doc.irasia.com/listco/hk/cewater/announcement/a240606a.pdf ; https://doc.irasia.com/listco/sg/cewater/announcement/attachments/CEWL_-_Entry_into_Concession_Agreement_for_Anyang_Municipal_WWT_Centre_Phase_I_Project_in_Henan_EN.pdf ; https://doc.irasia.com/listco/sg/cewater/announcement/a240606.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data