AO Kabbalkenergo
Sector: Government • Location: Kabardino-Balkar, Russian Federation
Source: World Bank Group
This is a regional electricity utility with 28-MW of generating capacity. It was privatized in 1993 and 68% of its stock was held by RAO EES Rossii.
As a result of the restructuring of the power sector in Russia during 2003-2008, JSC "Interregional Distribution Grid Company" (IDGC)Holding was established to manage interregional distribution grid companies(IDGCs).
As of end 2009, the main s
- Status
- Prospective
- Sector
- Government, Power Generation (CCGT), Power Transmission
- Location
- Kabardino-Balkar, Russia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about AO Kabbalkenergo
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a regional electricity utility with 28-MW of generating capacity. It was privatized in 1993 and 68% of its stock was held by RAO EES Rossii. As a result of the restructuring of the power sector in Russia during 2003-2008, JSC "Interregional Distribution Grid Company" (IDGC)Holding was established to manage interregional distribution grid companies(IDGCs). As of end 2009, the main shareholders were Holding IDGC JSC (65.26%), the Federal government (13%), Depositary Clearing Company (6.11%) and others (15.63%). The shareholders remained the same through 2011. As of September 2011, IDGC's main shareholderes were - the Russian government (55.95%),Depository Clearing Company (14.76%), Depository and Corporate Technologies (13.89%),Gazprom EnergoHolding(4.56%), and National Depository Center (7.57%) % private = 6.11%+15.63%+ (36.2% * 65%)=44.74 http://kabene.ru/ company site http://markets.ft.com/Research/Markets/Tearsheets/Financials?s=kabe:RTS&subview=CashFlow |
Original sector | Energy |
Budget |
Location
Country | Russia |
State | Kabardino-Balkar |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Power Generation (CCGT), Power Transmission |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
