AO Pskovenergo
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
This regional electricity utility has 12.5-MW of generating capacity. It was privatized in 1993 and 49% of its stock was held by RAO EES Rossii.
As a result of the restructuring of the power sector in Russia during 2003-2008, Pskovenergo is a branch of JSC "Interregional Distribution Grid Company of the Northwest" (JSC IDGC of the North West). JSC IDGC consists of seven branches - "Arkhenergo",
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Power Transmission, Residential, Telecommunications, Government
- Location
- Russia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about AO Pskovenergo
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This regional electricity utility has 12.5-MW of generating capacity. It was privatized in 1993 and 49% of its stock was held by RAO EES Rossii. As a result of the restructuring of the power sector in Russia during 2003-2008, Pskovenergo is a branch of JSC "Interregional Distribution Grid Company of the Northwest" (JSC IDGC of the North West). JSC IDGC consists of seven branches - "Arkhenergo", "Vologdaenergo", "Karelenergo", "Kolenergo", "Komienergo", "Novgorodenergo", "Pskovenergo." 55.4% of the share capital of JSC "MRSC North-West" owned by OAO "IDC Holding, a state-owned entity. JSC IDGC Holding is a company established as a result of the reorganization of RAO UES of Russia to manage interregional distribution grid companies (IDGCs) The main activities of "Pskovenergo" were the provision of services for electric power transmission and grid connection to the grid in the Pskov region. The composition of "Pskovenergo" consists of six production offices - Northern electrical networks, power grids Eastern, Southern electric networks, the Western power grids, power grids and the central Energoavto. "Pskovenergo" operates energy facilities-voltage 110 kV, 35 kV, 6-10 kV and 0.4 kV. On the balance of power companies are overhead and cable transmission line length of 45 390 km, 170 kV substations 110-35, transformer input is 1983 MVA and 10 988 TP 10/0, 4 kV, the total transformer capacity of which 1643 MVA. http://eng.mrsksevzap.ru/about/about/ As a result of RAO UES led power sector restructuring in Russia over 2003-2008, AO Pskovenergo merged with the Wholesale Generating Company OGK-2. |
Original sector | Energy |
Budget |
Location
Country | Russia |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Power Transmission, Residential, Telecommunications, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project