A.P Coffee & Bakery / omo-studio
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
Text description provided by the architects.When I first encountered the scene, The interior, which was completely demolished, was a space made of concrete on all sides. Pillars lined the long walls and Between the pillars, I could see the dark green landscape. I thought this panoramic landscape would make a nice background as it changes color depending on the season.The skeleton is made of strong
- Status
- Closed
- Sector
- Cement, Metal, Residential, Commercial, Warehouse
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about A.P Coffee & Bakery / omo-studio
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Text description provided by the architects.When I first encountered the scene, The interior, which was completely demolished, was a space made of concrete on all sides. Pillars lined the long walls and Between the pillars, I could see the dark green landscape. I thought this panoramic landscape would make a nice background as it changes color depending on the season.The skeleton is made of strong zinc square pipes that do not have a strong presence(Lattice structure like a jungle gym). Wood and metal works are combined to serve as a display stand, counter, and shelf. This may be dismantled and replaced with another one later as needed. The fabric and top are combined to form a table and chair even in the unfixed square tube structure. As impressive as it is, along the side window, a 20-meter-long wooden table is made between the columns. This long wooden board, which looks just like a simple structure, is also used as a great work table by the lighting and chairs.What is clear is that the contrast between the landscape outside and the concrete inside was well-matched. Maybe that's why the site felt like a newly built reinforced concrete building. Therefore, the proper way to work is to maintain the existing materials naturally and add new functions for the new program. This is similar to the characteristics of hypothetical structures called scaffolding. Build a structure on the inside or outside of a building and put a perforated plate on it to use it as a scaffold or hang a net to prevent a fall |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Cement, Metal, Residential, Commercial, Warehouse |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
- Kearl Ore Preparation Plant
