Apache Avenue Pedestrian Safety and Connectivity
Sector: Water Supply and Storage • Location: South Lake Tahoe, California, United States of America
Source: Dodge USA
The Project will be bid as a Base Bid (Schedule A) and Additive Alternate Bid (Schedule B) in accordance with the Proposal and Special Provisions. Base Bid (Schedule A) consists of construction of pedestrian, bicycle, and drainage improvements. The improvements include roadway paving, rolled curb and gutter, sidewalk, class 1 bike path, and striping. Additive Alternate Bid (Schedule B) consists of
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Waste Processing and Treatment, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- South Lake Tahoe, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Apache Avenue Pedestrian Safety and Connectivity
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project will be bid as a Base Bid (Schedule A) and Additive Alternate Bid (Schedule B) in accordance with the Proposal and Special Provisions. Base Bid (Schedule A) consists of construction of pedestrian, bicycle, and drainage improvements. The improvements include roadway paving, rolled curb and gutter, sidewalk, class 1 bike path, and striping. Additive Alternate Bid (Schedule B) consists of construction of waterline replacement improvements. Other items or details not mentioned above, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | South Lake Tahoe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Waste Processing and Treatment, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
