Apache Junction Operations & Fleet Maintenance Building
Sector: Waste Processing and Treatment • Location: Apache Junction, Arizona, United States of America
Source: Dodge
Apache Junction Sewer District is looking to construct an operations & fleet maintenance facility with 10,328 sq ft parking canopy on existing District Sewer site, along with associated parking and site improvements. This work shall consist of site improvements for automobile parking with deferred canopies and site lighting; a 2-story pre-engineered metal maintenance building with office, control
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Metal, Automotive, Car parking, Residential, Manufacturing (Industrial), Commercial
- Location
- Apache Junction, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Apache Junction Operations & Fleet Maintenance Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Apache Junction Sewer District is looking to construct an operations & fleet maintenance facility with 10,328 sq ft parking canopy on existing District Sewer site, along with associated parking and site improvements. This work shall consist of site improvements for automobile parking with deferred canopies and site lighting; a 2-story pre-engineered metal maintenance building with office, control room, storage and maintenance bays, providing flexible storage area (no high racking), and vehicl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Apache Junction |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Metal, Automotive, Car parking, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
