Apartment Building (Alteration)
Sector: Car parking • Location: New York, United States of America
Source: Dodge
HEREBY FILING FOR THE COMBINATION OF APARTMENTS 5A AND 5B LOCATED ON THE FIFTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS. HEREBY FILING FOR THE REPLACEMENT. REMOVAL AND INSTALLATION OF FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
- Status
- Prospective
- Sector
- Car parking, Residential, Automotive, Commercial, Manufacturing (Industrial)
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Apartment Building (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | HEREBY FILING FOR THE COMBINATION OF APARTMENTS 5A AND 5B LOCATED ON THE FIFTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS. HEREBY FILING FOR THE REPLACEMENT. REMOVAL AND INSTALLATION OF FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Residential, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
