Apartment Building Interior
Planning schematics · New York · Last reported Aug 2025
Source: Dodge
INTERIOR REHAB OF DWELLINGS IN MULTI-FAMILY BUILDING. NO CHANGE IN USE PROPOSED. REMOVE WALL AND CEILING GYPSUM BOARD ALL AROUND. REMOVE FLOOR FINISH ALL AROUND. REMOVE DOORS AS PER PLAN. REMOVE ALL WINDOWS. REMOVE ALL BATHROOM AND KITCHEN APPLIANCES. INSPECT GAS PIPES. REPLACE LEAKING GAS PIPES IF NEEDED. REPLACE KITCHEN AND BATHROOM APPLIANCEAT 2ND FLOOR (UNIT B3.) NO CHANGE IN USE PROPOSED
- Status
- Prospective
- Sector
- Residential, Manufacturing (Industrial), Commercial
- Location
- Bergen Beach, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Apartment Building Interior
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | INTERIOR REHAB OF DWELLINGS IN MULTI-FAMILY BUILDING. NO CHANGE IN USE PROPOSED. REMOVE WALL AND CEILING GYPSUM BOARD ALL AROUND. REMOVE FLOOR FINISH ALL AROUND. REMOVE DOORS AS PER PLAN. REMOVE ALL WINDOWS. REMOVE ALL BATHROOM AND KITCHEN APPLIANCES. INSPECT GAS PIPES. REPLACE LEAKING GAS PIPES IF NEEDED. REPLACE KITCHEN AND BATHROOM APPLIANCEAT 2ND FLOOR (UNIT B3.) NO CHANGE IN USE PROPOSED |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Bergen Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
