Apartment Building
Construction · Illinois · Last reported Dec 2024
Source: Dodge USA
Work In Unit 1608/06 Only. Remodeling Of Existing Kitvhen,Bathroom, Living Room, Bedroom-Same As Existing. Replace Door, Plumbing Fixtrures, Kitchen Cabinets, Appliances. Install New Ceramic Tiles, Baseboards.Replace Old Galvanized Water Supply Pipes For New Copper Ones. Painting Entire Unit.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Residential, Commercial, Metal
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Apartment Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work In Unit 1608/06 Only. Remodeling Of Existing Kitvhen,Bathroom, Living Room, Bedroom-Same As Existing. Replace Door, Plumbing Fixtrures, Kitchen Cabinets, Appliances. Install New Ceramic Tiles, Baseboards.Replace Old Galvanized Water Supply Pipes For New Copper Ones. Painting Entire Unit. |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Residential, Commercial, Metal |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
