Apartment Building
Construction documents · California · Last reported Dec 2024
Source: Dodge USA
305 dwellings, including two larger units for on-site managers. The manager units will be two-bedroom and three-bedroom residences. The remaining 303 residences will be studios priced as affordable to low-income households. The permit does not specify if the site includes vehicular parking, and illustrations indicate that much of the first two floors will be used for housing, in contrast with prev
- Status
- Closed
- Sector
- Manufacturing (Industrial), Car parking, Residential, Automotive, Commercial, Cement
- Location
- San Jose, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Apartment Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 305 dwellings, including two larger units for on-site managers. The manager units will be two-bedroom and three-bedroom residences. The remaining 303 residences will be studios priced as affordable to low-income households. The permit does not specify if the site includes vehicular parking, and illustrations indicate that much of the first two floors will be used for housing, in contrast with previous plans. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Jose |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Car parking, Residential, Automotive, Commercial, Cement |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
