The Brazilian company Centrais Eletricas Belem S.A. (CEBEL), a wholly-owned subsidiay of Companhia Energética Serra da Carioca S.A., was granted an authorization by the regulatory agency ANEEL to build and operate a 30-MW small hydro power plant located in the Comemoracao River, state of Rondonia (in the municipalities of Vilhena). The 30-year contract was signed with the regulatory agency ANEEL i

Project Information FAQ

Project Information

4 Q
The project “Apertadinho Small Hydro Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

distressed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Centrais Eletricas Belem S.A. (CEBEL), a wholly-owned subsidiay of Companhia Energética Serra da Carioca S.A., was granted an authorization by the regulatory agency ANEEL to build and operate a 30-MW small hydro power plant located in the Comemoracao River, state of Rondonia (in the municipalities of Vilhena). The 30-year contract was signed with the regulatory agency ANEEL in May 2002. CEBEL S.A. committed to invest US$ 74.3 million (BRL 162 million) in the construction of PCH Apertadinho. Financial closure for the project was reached in 2006, when the company was granted a US$ 68.8 million (BRL 150 million) syndicated loan by three pension funds from the employees of utility companies (Petros from Petrobras, Celos from Celesc and Prece from Cedae). Construction works on this power plant started in 2007, and the unit would become operational in 2008, but days before the inauguration, the dam did not resist. The company had to pay about US$ 30 million (BRL 60 million) in environmental damages costs, and sued the consortium responsible for the EPC contract (Schahin Engenharia e EIT - Empresa Industrial e Tecnica). By the time the accident happened, the insurance policy had expired. The company began to rebuild the power plant, and as of August 2010 the project was still under construction. As of February 2012, construction works were still underway and due to the delays the regulatory agency ANEEL refused to grant the project company with subsidies it once had right to use to finance the project. PCH Apertadinho signed a power purchase agreement with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data