Distressed

The Brazilian company Centrais Eletricas Belem S.A. (CEBEL), a wholly-owned subsidiay of Companhia Energética Serra da Carioca S.A., was granted an authorization by the regulatory agency ANEEL to build and operate a 30-MW small hydro power plant located in the Comemoracao River, state of Rondonia (in the municipalities of Vilhena). The 30-year contract was signed with the regulatory agency ANEEL i

Status
Failure
Sector
Hydro, Water Supply and Storage, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Apertadinho Small Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Apertadinho Small Hydro Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

distressed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Centrais Eletricas Belem S.A. (CEBEL), a wholly-owned subsidiay of Companhia Energética Serra da Carioca S.A., was granted an authorization by the regulatory agency ANEEL to build and operate a 30-MW small hydro power plant located in the Comemoracao River, state of Rondonia (in the municipalities of Vilhena). The 30-year contract was signed with the regulatory agency ANEEL in May 2002. CEBEL S.A. committed to invest US$ 74.3 million (BRL 162 million) in the construction of PCH Apertadinho. Financial closure for the project was reached in 2006, when the company was granted a US$ 68.8 million (BRL 150 million) syndicated loan by three pension funds from the employees of utility companies (Petros from Petrobras, Celos from Celesc and Prece from Cedae). Construction works on this power plant started in 2007, and the unit would become operational in 2008, but days before the inauguration, the dam did not resist. The company had to pay about US$ 30 million (BRL 60 million) in environmental damages costs, and sued the consortium responsible for the EPC contract (Schahin Engenharia e EIT - Empresa Industrial e Tecnica). By the time the accident happened, the insurance policy had expired. The company began to rebuild the power plant, and as of August 2010 the project was still under construction. As of February 2012, construction works were still underway and due to the delays the regulatory agency ANEEL refused to grant the project company with subsidies it once had right to use to finance the project. PCH Apertadinho signed a power purchase agreement with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies).

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project