Apex Plaza Condominiums
Sector: Water Supply and Storage • Location: Taylorsville, Utah, United States of America
Source: Dodge
steel and wood frame - 1st floor 3600 sq ft retail (vanilla envelope) & 5 garage units - 2nd floor 3600 sq ft 5 residential units - rooftop pation with storage -Civil Demolition Utilities Erosion Control / Storm Water Finishes (Paint, Flooring, Countertops) Gypsum Walls & Framing Doors, Frames, and Hardware / Garage Doors Landscape Interior Framing Asphalt & Paving Division 10 Specialties Millwork
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Road, Power Transmission, Power Generation (CCGT), Residential, Commercial, Car parking, Automotive, Manufacturing (Industrial), Metal
- Location
- Taylorsville, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Apex Plaza Condominiums
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding-invitation |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | steel and wood frame - 1st floor 3600 sq ft retail (vanilla envelope) & 5 garage units - 2nd floor 3600 sq ft 5 residential units - rooftop pation with storage -Civil Demolition Utilities Erosion Control / Storm Water Finishes (Paint, Flooring, Countertops) Gypsum Walls & Framing Doors, Frames, and Hardware / Garage Doors Landscape Interior Framing Asphalt & Paving Division 10 Specialties Millwork & Cabinets Appliances Windows Storefront Fire Suppression Insulation & Sealants -TPO Roofing Ext... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Taylorsville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Road, Power Transmission, Power Generation (CCGT), Residential, Commercial, Car parking, Automotive, Manufacturing (Industrial), Metal |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
