Apfel House / Hebra Arquitectos
Sector: Metal
Source: ArchDaily
Text description provided by the architects.Two arms were arranged perpendicular to each other. On one side, a wing that houses a common area, services, and the master bedroom was positioned parallel to Lake Ranco and the mountain range, while the other wing, which houses four bedrooms and three bathrooms, was placed against it, forming a "T" shaped floor plan.Secondly, the openings were conceived
- Status
- Closed
- Sector
- Metal, Commercial, Residential
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Apfel House / Hebra Arquitectos
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Text description provided by the architects.Two arms were arranged perpendicular to each other. On one side, a wing that houses a common area, services, and the master bedroom was positioned parallel to Lake Ranco and the mountain range, while the other wing, which houses four bedrooms and three bathrooms, was placed against it, forming a "T" shaped floor plan.Secondly, the openings were conceived within pre-framed metal plates, so that they would have a certain autonomy from the walls and become features that not only contain functional windows for the interior spaces but also occasionally become composite features of several windows that cross from side to side, revealing the rhythm of the structure and responding to a larger scale.First, the roof was designed with the highest point at the intersection of the two wings, while its height decreases towards the ends.Lastly, the house was situated on stone walls that emerged from the ground and, while still being part of the landscaping, became part of its base.The intention was to create a restrained, non-invasive, and subtly present architecture. To achieve this, three operations were carried out. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Residential |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
