logo

APG grid modernisation and expansion project at Ernsthofen substation

Sector: Manufacturing (Industrial) • Location: Linz (central Upper Austrian region), Lower and Upper Austria, Austria

Source: Renewables Now

Project
Under Construction

Transmission system operator Austrian Power Grid AG (APG) is progressing with a EUR-140-million (USD 163.9m) project to modernise and expand the Ernsthofen substation, which plays a key role for the nationwide transport of renewable energy along the east–west axis. The project includes commissioning a regional control centre, modernising 110 kV installation completed in 2022, renewing 220 kV switc

Project Information FAQ

Project Information

4 Q
The project “APG grid modernisation and expansion project at Ernsthofen substation” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Linz (central Upper Austrian region), Lower and Upper Austria, Austria. Taiyo aggregates data on it from Renewables Now.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Transmission system operator Austrian Power Grid AG (APG) is progressing with a EUR-140-million (USD 163.9m) project to modernise and expand the Ernsthofen substation, which plays a key role for the nationwide transport of renewable energy along the east–west axis. The project includes commissioning a regional control centre, modernising 110 kV installation completed in 2022, renewing 220 kV switchgear in phases (first phase completed in 2025, second in 2027, third in 2029), and installing three new 220/110 kV large power transformers. The substation secures supply for large parts of Lower and Upper Austria, including industrial regions.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data