logo
ProjectCompleted

APM TEC II

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

The Company is developing a greenfield specialized container terminal at the existing Port of Lázaro Cárdenas, located in the State of Michoacán on Mexico’s Pacific coast, 620 km southwest of Mexico City (“the “Terminal” or ‘TEC II”). The site is located within an industrial area granted by APILAC on the northern extreme of the North Channel and comprises a total area of 102 hectares (once all sta

Status
Closed
Sector
Seaport, Road, Manufacturing (Industrial), Government, Rail
Location
Mexico
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about APM TEC II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “APM TEC II” is an infrastructure initiative in the Seaport sector, located in Mexico. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Company is developing a greenfield specialized container terminal at the existing Port of Lázaro Cárdenas, located in the State of Michoacán on Mexico’s Pacific coast, 620 km southwest of Mexico City (“the “Terminal” or ‘TEC II”). The site is located within an industrial area granted by APILAC on the northern extreme of the North Channel and comprises a total area of 102 hectares (once all stages are fully developed). The Port of Lázaro Cardenas has a total area of 4,385 hectares and includes several port terminals for the movement of general goods, minerals, grain and automobiles. The nearest community to the project site is the City of Lázaro Cardenas located approximately 2 kilometers from the site and on the opposite side of the Balsas River.The Project represents stage 1 of an investment under the contract with the Port Authority and primarily consists of (i) constructing a 750 meter quay for container berths; (ii) deepening the Terminal’s draft alongside to 16.5 meters; (iii) installing the necessary cargo handling equipment; (iv) installing rail tracks to facilitate rail evacuation of the cargo; and (v) developing the Terminal''s yard and supporting backup areas and infrastructure (the “Project”). The initial estimated throughput capacity of stage 1 will be of 1.27 million twenty-foot equivalent units (“TEUs”) of container handling capacity.

Original sector

E-BB - Port and Harbor Operations

Procurement method

Location

Country

Mexico

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Seaport, Road, Manufacturing (Industrial), Government, Rail

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project