APM Terminals Poti Deep-Water Expansion
Sector: Water Supply and Storage • Location: Poti, Georgia
Source: Azərtac
The project involves the expansion of APM Terminals Poti with a new approximately 700-meter deep-water quay with a 13.5–14.5-meter draft, allowing the handling of vessels carrying up to 9,000 TEU. The first phase alone exceeds a USD 250 million investment and is designed to increase annual capacity to approximately 1 million TEU in the medium term, with a long-term goal of up to 50 million tons an
- Status
- Under Construction
- Sector
- Water Supply and Storage
- Location
- Poti, Georgia
- Updated
- 22 Jul 2026
- Source
- Azərtac
ConstructChat
Ask ConstructChat about APM Terminals Poti Deep-Water Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the expansion of APM Terminals Poti with a new approximately 700-meter deep-water quay with a 13.5–14.5-meter draft, allowing the handling of vessels carrying up to 9,000 TEU. The first phase alone exceeds a USD 250 million investment and is designed to increase annual capacity to approximately 1 million TEU in the medium term, with a long-term goal of up to 50 million tons and 2 million TEU annually. |
Original sector | Transport |
Budget |
Location
Country | Georgia |
City | Poti |
Source
Source | Azərtac |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
