Appleton - Watermain Replacement Circular/TCH
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
"To replace 225m of 150mm Watermain on Circular Road- this will include the removal of 1350m2 of existing asphalt to be replaced with 180 tonnes of new asphalt. This will also include new services to 11 houses on this street. There will also be 120m of 150mm watermain placed nearby on the side of the TCH with the purpose of servicing 4 houses in the area."
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 19 Nov 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Appleton - Watermain Replacement Circular/TCH
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | "To replace 225m of 150mm Watermain on Circular Road- this will include the removal of 1350m2 of existing asphalt to be replaced with 180 tonnes of new asphalt. This will also include new services to 11 houses on this street. There will also be 120m of 150mm watermain placed nearby on the side of the TCH with the purpose of servicing 4 houses in the area." |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
