Appleton Public Library Construction
Sector: Commercial • Location: Appleton, Wisconsin, United States of America
Source: Dodge USA
The geothermal bid unit consists of geothermal design, coordination, construction and well drilling at the new Appleton Public Library. Drilling is anticipated for spring 2024 and building completion is anticipated in September 2024. The polished concrete bid unit consists of polishing the existing concrete floor slab at the new Appleton Public Library.
- Status
- Closed
- Sector
- Commercial, Geothermal, Cement, Education, Government, Manufacturing (Industrial)
- Location
- Appleton, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Appleton Public Library Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The geothermal bid unit consists of geothermal design, coordination, construction and well drilling at the new Appleton Public Library. Drilling is anticipated for spring 2024 and building completion is anticipated in September 2024. The polished concrete bid unit consists of polishing the existing concrete floor slab at the new Appleton Public Library. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Appleton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Cement, Education, Government, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
