AQABA STEAM -POWER V
Closed · Jordan
Source: World Bank Group
The Fifth Power Project will meet the growing power demand at least cost to the economy. In addition, the project will help improve the quality of power supply and accelerate the country's regional electrification. It will also contribute to the institution building efforts to strengthen JEA, and help improve energy sector planning and coordination. The project, which is a part of JEA's power syst
- Status
- Closed
- Sector
- Power Generation (CCGT), Oil and Gas, Geothermal, Commercial, Government
- Location
- Jordan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about AQABA STEAM -POWER V
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Fifth Power Project will meet the growing power demand at least cost to the economy. In addition, the project will help improve the quality of power supply and accelerate the country's regional electrification. It will also contribute to the institution building efforts to strengthen JEA, and help improve energy sector planning and coordination. The project, which is a part of JEA's power system development program for 1982-1986, has the following components: (i) a seawater-cooled steam power station at Aqaba comprising two 130 MW oil-fueled generating units and accessories; (ii) a 320-km long transmission line from Aqaba to Amman; and (iii) consultant services for engineering, erection, supervision, and initial operation. The principal benefits of the project will accrue to the industry and to the hitherto unserved population. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Jordan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Oil and Gas, Geothermal, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
