Aqualia Bengbu Wastewater
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In August of 2005, Fomento de Construcciones y Contratas SA (FCC) of Spain, through its water subsidiary Aqualia, was awarded a 25-year concession contract to rehabilitate, build and operate wastewater treatment plants in Bengbu, Anhui province. Under the contract, a population of 2,000,000 inhabitants was to be served.
To implement the contract, a 50-50% joint venture project company was for
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Government, Waste Processing and Treatment
- Location
- Anhui, China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Aqualia Bengbu Wastewater
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In August of 2005, Fomento de Construcciones y Contratas SA (FCC) of Spain, through its water subsidiary Aqualia, was awarded a 25-year concession contract to rehabilitate, build and operate wastewater treatment plants in Bengbu, Anhui province. Under the contract, a population of 2,000,000 inhabitants was to be served. To implement the contract, a 50-50% joint venture project company was formed between Aqualia and the local state-owned BCCA. The JV was to be responsible for: Managing the wastewater treatment plant no.1 in Bengbu with a capacity of 100,000 cubic meters per day; building and managing an enlargement to the plant which was to bring its capacity to a total of 200,000 cubic meters per day; designing, building and managing the two phases of the Yantaizi Plant (Bengbu No2) with a final capacity of 200,000 cubic meters per day. Investment in the project was expected to total euro 49 million (US$60.6 million) and Aqualia expected to earn revenues totalling euro 500 million over the life of the contract. Work was to begin early in 2006. |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
State | Anhui |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Government, Waste Processing and Treatment |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in China
- Black Point Combined Cycle Power Plant Hong Kong
- Hongyanhe Nuclear Power Plant Liaoning
- Yangcheng CoalFired Power Plant Shanxi Province
- Tianhuangping PumpedStorage Hydro Plant
- Xiangjiaba Hydropower Plant
- Fuqing Nuclear Power Plant Fujian
- Huoqiu County Pipeline Gas Project
- Fuchuan Xiehe Shijia Wind Power Plant
