AR CRL1 APL1 Buenos Aires Infrastructure
One of 10,000+ projects Taiyo tracks in Argentina.
Source: World Bank
The overall purpose of the Program is to improve the provision of infrastructure services in the Province of Buenos Aires, within a framework of fiscal responsibility as a means of supporting the return to a sustainable path of economic growth, to alleviate poverty, and increase social equity. To this end, the Province is prioritizing a set of interventions under the infrastructure Program for the
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Seaport, Government
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about AR CRL1 APL1 Buenos Aires Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The overall purpose of the Program is to improve the provision of infrastructure services in the Province of Buenos Aires, within a framework of fiscal responsibility as a means of supporting the return to a sustainable path of economic growth, to alleviate poverty, and increase social equity. To this end, the Province is prioritizing a set of interventions under the infrastructure Program for the period 2005-2010. Specifically, project components include: 1) Roads component will support: a) a road rehabilitation program for the provincial primary paved network (interurban, and urban within the Greater Metropolitan Area of Buenos Aires - CB -) that aims at gradually achieving a steady-state condition; b) the rehabilitation of access roads to some ports and localities; and, c) the removal of selected bottlenecks, widening some sections of the primary network within the CB, and enhancing intersections in high-traffic roads, all of which must comply with the agreed eligibility criteria. 2) The water and sewerage component will expand the provision of services towards areas of low income, and high vulnerability, many of them located within the Greater Metropolitan Area of Buenos Aires, financing mostly secondary sewerage systems that take advantage of existing primary facilities. 3) The drainage component will finance a series of drainage subprojects in urban, and peri-urban areas, mostly storm sewers in the CB, that comply with the agreed eligibility criteria. 4) The technical Assistance component aims to: a) strengthen the institutional capacity in the public entities involved in Project execution, and other entities dealing with policy design, planning, regulation and control of infrastructure services; and, b) build-up a strategic framework to facilitate economic development, competitiveness, and foster employment, based on which the provincial authorities would set guidelines on sector, and territorial development, design infrastructure policies, and orient investment decision-making within the Province. |
Original sector | FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Argentina |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Seaport, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
