logo

Arab International Hotels Limited (AIHC)

Sector: Car parking • Location: Jordan

Source: International Finance Corporation (IFC)

Project
Completed
- 2 -	May 4, 1998International Finance CorporationA Member of the World Bank GroupInternational Finance CorporationA Member of the World Bank GroupEnvironmental Review Summary (ERS)Project Name			JORDAN:  Amman Marriott/AIHCRegion				Central Asia, Middle East and North AfricaSector				Hotels and TourismProject No.			008858						May 4, 1998										1.		This project involves the renovation and exp

Project Information FAQ

Project Information

4 Q
The project “Arab International Hotels Limited (AIHC)” is an infrastructure initiative in the Car parking sector, located in Jordan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

- 2 - May 4, 1998International Finance CorporationA Member of the World Bank GroupInternational Finance CorporationA Member of the World Bank GroupEnvironmental Review Summary (ERS)Project Name JORDAN: Amman Marriott/AIHCRegion Central Asia, Middle East and North AfricaSector Hotels and TourismProject No. 008858 May 4, 1998 1. This project involves the renovation and expansion of the Amman Marriott. The plans involve refurbishment of all 294 rooms, addition of conference and banquet facilities, movie theaters, retail space and underground parking.2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of the project consisted of appraising technical and environmental information submitted by the project sponsor, and the technical appraisal and site review completed by IFC’s Technical and Environment staff. The following potential environmental, health and safety impacts of the project were analyzed:· sewage treatment and disposal;· liquid and solid waste disposal;· water and power supply;· recovery of dry cleaning solvents;· CFCs;· employee safety training and emergency response; and· fire protection measures.The information provided by AIHC about how each of these potential impacts will be addressed in the development of the proposed project is summarized in the paragraphs that follow.3. The hotels sewage and liquid waste are discharged to the Zerka municipal sewage system. This facility will treat waste from all point sources within the hotel; including sewage, gray water from kitchens and laundry. The facility has the capacity to treat the hotel’s effluent and will comply with World Bank guidelines for liquid effluents.4. Solid waste from the hotel will be collected and disposed of by the municipality at designated sites. AIHC will implement a recycling program throughout the hotel.5. Water for the hotel’s operations will be supplied by the national water authority. Power supply will be provided by the national grid.6. Dry cleaning solvents are recovered by the solvent supplier. The sponsor has committed that all cold storage and central cooling system will be CFC-free.7. AIHC will provide all employees with the necessary training including equipment handling, proper work procedures, fire safety, and emergency preparedness.8. AIHC has committed to conduct, as condition of first disbursement of IFC’s loan, an independent fire safety audit of all existing structures and proposed renovations and new structures. This audit will identify necessary corrective action which the sponsor will fully implement.9. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that AIHC proposed project will meet World Bank environmental, health and safety policies and guidelines and host country requirements.10. IFC will monitor ongoing compliance with World Bank environmental, health and safety policies and guidelines during the lifetime of the project by evaluating reports submitted annually to IFC by AIHC and by conducting periodic supervision.\\StreetTalk\Shared Data@CTENET@IFC\wpeu\ROSA\JORDAN\AIHC.ers.docMay 11, 1998 1:06 PM

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data