logo

Aracati Wind Complex

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Alupar was granted authorizations to build five wind power plants located in the state of Ceara (94 MW in total capacity). The wind farm was named Aracati Wind Complex, and the sponsors created different special purpose companies to manage each power plant, as described below.

  • EOL Goiabeira (19,2MW) - Energia dos Ventos I S.A.

  • EOL Ubatuba (12,6MW) - Energia dos Ventos I

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Government, Steel, Wind, Raw Materials, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Aracati Wind Complex

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Aracati Wind Complex” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Alupar was granted authorizations to build five wind power plants located in the state of Ceara (94 MW in total capacity). The wind farm was named Aracati Wind Complex, and the sponsors created different special purpose companies to manage each power plant, as described below. * EOL Goiabeira (19,2MW) - Energia dos Ventos I S.A. * EOL Ubatuba (12,6MW) - Energia dos Ventos II S.A. * EOL Santa Catarina (16MW) - Energia dos Ventos III S.A. * EOL Pitombeira (27MW) - Energia dos Ventos IV S.A. * EOL Horizonte (14.4 MW) - Energia dos Ventos X S.A. The 35-year contracts were signed with the regulatory agency ANEEL in 2012. In 2011, the company took part in a competitive bidding process to sell electricity to the regulated wholesale market (15-year power purchase agreement was signed guaranteeing the sale of electricity to the electricity distribution companies). The sponsor submitted the winning bids of US$ 65.6 /MWh (BRL 107.7/MWh) for all power plants of Aracati Wind Complex. The total investment committed to the power plants was estimated at US$ 92.4 million (BRL 308.2 million). In December 2015, the state-owned bank BNDES approved a US$ 78.3 million (BRL 261.3 million) loan to the project. The remaining investment cost was set to be equity financed. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. Finally, the electricity sold by the company was not subject to sector taxes.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government, Steel, Wind, Raw Materials, Manufacturing (Industrial)

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project