The 109km Arad-Szeged gas pipeline runs between Arad in western Romania and Szeged in Hungary. The pipeline was officially inaugurated in October 2010. The 700mm-diameter pipeline has an annual design capacity of 4.5 billion cubic metres. The pipeline initially carries 1.7 billion cubic metres of gas at the rate of 500,000m³/h from Hungary to Romania. It is also capable of carrying gas in the

Project Information FAQ

Project Information

4 Q
The project “Arad-Szeged Gas Pipeline” is an infrastructure initiative in the Commercial sector, located in Romania. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 109km Arad-Szeged gas pipeline runs between Arad in western Romania and Szeged in Hungary. The pipeline was officially inaugurated in October 2010. The 700mm-diameter pipeline has an annual design capacity of 4.5 billion cubic metres. The pipeline initially carries 1.7 billion cubic metres of gas at the rate of 500,000m³/h from Hungary to Romania. It is also capable of carrying gas in the other direction with certain modifications at the Romanian end. The maximum design pressure of the pipeline is 6.3mpa. An investment of €68m was made in the project. The EU provided €17m through the European Energy Economic Recovery Programme (EERP). The Arad-Szeged gas pipeline is the first project to be implemented under the EERP. The EU has been supporting projects which help in improving energy infrastructures of the central and eastern European region. Romania consumes approximately 17-18 billion cubic metres of natural gas annually. Russian gas imports constitute 20%-25% of this consumption. The pipeline connects Romania’s gas transport system with Europe. As a result, Romania need not be dependent on natural gas supplied by Russia through Ukraine. The pipeline will also increase competition and enable gas to be imported at lower prices. Design and planning works were initiated in 2008 with archaeological excavation works commencing in 2009. Construction commenced in the first quarter of 2009. Pipes were also delivered during this period. The Romanian section of the pipeline is 62km from Horia (near Arad) to Nadlac near Csanadpalota on the Romanian-Hungary border. It was divided into different sections during construction. The Romanian section includes one gas metering station at Horia and a compressor station at Jupa. It also includes an underpass at the Danube river. The Hungarian section is 47km-long and runs between Algyõ and Csanádpalota. It was built at a cost of €32.4m and was completed in December 2009. This section includes a commercial metering station at Csanádpalota. Construction of the Hungarian section was completed in February 2010. The pipeline was originally scheduled for inauguration in July 2010 but delays in construction on the Hungarian section of the pipeline pushed the completion date. Test operations of the pipeline were carried out in August 2010 when Romania received small quantities of gas from Hungary. Local contractors were employed for construction of the pipeline. MOL Group, a unit of FGSZ Natural Gas Transmission, is the operator of the Hungarian section of the pipeline. Transgaz serves as the operator of the Romanian section. MOL and Transgaz signed a memorandum of understanding in January 2008 to connect the two sections of the pipeline. The final investment decision on construction of the pipeline was made towards the end of 2008. Both the companies financed the construction costs of the pipeline. Transgaz financed 46% of the costs of the Romanian section. OMV Petrom, E.ON, GDF SUEZ Energy Romania and MOL Energy Trade have booked the capacity of the Romanian section of the pipeline. Capacity of the Hungarian section has been booked by GDF SUEZ, MOL, E.ON and EconGas. Construction of the pipeline was part of MOL’s New Europe Transmission System (NETS) initiative which aims to connect the various gas networks in the region. The NETS initiative is expected to develop a uniform regional gas market in the region. It is also expected to increase security of supply in south and central eastern Europe. A number of smaller pipelines and interconnections are being planned to establish a uniform regional gas market. The Croatian-Hungarian interconnection pipeline is currently being implemented. Feasibility study for the Hungarian-Slovakian interconnection is also being developed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data