logo

Arad Urban Transport - Extension

Sector: Mass Transit • Location: Romania

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

The EBRD is considering providing a loan of up to EUR 20.3 million to the city of Arad. The project involves two components. The first component consists of a loan of EUR 9.3 million for: (i) acquisition of up to 5 energy efficient modern trams; (ii) modernisation of the main depot infrastructure; (iii) introduction of an e-ticketing system for the public transport in the City of Arad (the “Projec

Project Information FAQ

Project Information

3 Q
The project “Arad Urban Transport - Extension” is an infrastructure initiative in the Mass Transit sector, located in Romania. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering providing a loan of up to EUR 20.3 million to the city of Arad. The project involves two components. The first component consists of a loan of EUR 9.3 million for: (i) acquisition of up to 5 energy efficient modern trams; (ii) modernisation of the main depot infrastructure; (iii) introduction of an e-ticketing system for the public transport in the City of Arad (the “Project”).The second component of EUR 11 million will be used to re-finance the Bank’s existing loan, on the basis of the loan agreement dated 16 May 2009. The proposed project is part of a wider objective of the municipality to restructure the public transport system by reducing the traffic congestion and air pollution in the city centre while reducing energy consumption of the public transport. The restructuring of the Bank’s existing loan is meant to allow a better cash management for the City faced with a large investment programme across sectors, as well as reflect market conditions. The proposed project will improve the performance of the public transport system through: Arad Municipality, located in the western part of Romania, has a population of 173,000. A sub-sovereign loan to Arad Municipality of EUR 20.3 million. €23 million. The Project has been categorised B in accordance with the Bank’s Environmental and Social Policy 2008. The due diligence has been undertaken by independent consultant and comprised the environmental and social analysis of the proposed and previous projects, a review of all key EHSS background information and project documentation and meetings with local regulators and other key stakeholders. The investigations showed that the future adverse impacts of the project will be site specific and addressed through appropriate mitigation measures. The transaction will enable Arad municipality to continue to implement a comprehensive tram transport rehabilitation programme, financed partly by the original loan. The project implementation is limited to urban area within the boundaries of the City and no sensitive ecological receptors or protected zones are affected. It is confirmed that the project will not have adverse social impacts to local communities or other project affected parties, while a number of very tangible environmental and social benefits are likely to arise. The due diligence confirmed that the Company and the City have efficient public communication, consultation and disclosure policy and that in general meets the EBRD's requirements. In order to avoid, minimise and mitigate the potential adverse E&S impacts of the project and ensure full compliance with national regulations and EBRD's PRs an Environmental and Social Action Plan (ESAP) has been developed to address the necessary improvements in the Company's and contractors’ E&S management systems and capacity and improvements in managing construction activities. The project will be monitored in terms of its environmental and social performance and implementation of the ESAP through annual E&S reports and site visits when deemed necessary. Technical Cooperation assistance is provided as follows:

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data