logo

Araputanga Centrais Eletricas SA (Arapucel)

Sector: Hydro • Location: Mato Grosso, Brazil

Source: World Bank Group

Project
Active

The project comprises the construction and operation of three hydropower plants in the Jauru river, Mato Grosso state. The total installed capacity will be 63MW. The company responsible for the project is Araputanga Centrais Eletricas SA (Arapucel), controlled by BK Energia Participacoes Ltda, owned by Brennand group (80%) and by Klobitz Ltda (20%). The estimated total costs were US$62.5 million (

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Commercial, Government
Location
Mato Grosso, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Araputanga Centrais Eletricas SA (Arapucel)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Araputanga Centrais Eletricas SA (Arapucel)” is an infrastructure initiative in the Hydro sector, located in Mato Grosso, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project comprises the construction and operation of three hydropower plants in the Jauru river, Mato Grosso state. The total installed capacity will be 63MW. The company responsible for the project is Araputanga Centrais Eletricas SA (Arapucel), controlled by BK Energia Participacoes Ltda, owned by Brennand group (80%) and by Klobitz Ltda (20%). The estimated total costs were US$62.5 million (R$417 million). The Brazilian Development Bank, BNDES, approved a financing of US$45.5 million (R$107 million) for the project in September 2001. The first plant (Alto Jauru – 20MW) started operations in the first semester of 2003. The second plant (Indiavai – 26MW) was expected to start operations in July 2003. The third plant (Ombreiras – 30MW) was expected to be operation in May 2004. In June 2003, BK Energia signed a PPA to sell the energy produce by all three plants to Centrais Eletricas do Mato Grosso (Cemat).

Original sector

Energy

Budget

Location

Country

Brazil

State

Mato Grosso

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Commercial, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project