Araputanga Centrais Eletricas SA (Arapucel)
Sector: Hydro • Location: Mato Grosso, Brazil
Source: World Bank Group
The project comprises the construction and operation of three hydropower plants in the Jauru river, Mato Grosso state. The total installed capacity will be 63MW. The company responsible for the project is Araputanga Centrais Eletricas SA (Arapucel), controlled by BK Energia Participacoes Ltda, owned by Brennand group (80%) and by Klobitz Ltda (20%). The estimated total costs were US$62.5 million (
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Commercial, Government
- Location
- Mato Grosso, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Araputanga Centrais Eletricas SA (Arapucel)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises the construction and operation of three hydropower plants in the Jauru river, Mato Grosso state. The total installed capacity will be 63MW. The company responsible for the project is Araputanga Centrais Eletricas SA (Arapucel), controlled by BK Energia Participacoes Ltda, owned by Brennand group (80%) and by Klobitz Ltda (20%). The estimated total costs were US$62.5 million (R$417 million). The Brazilian Development Bank, BNDES, approved a financing of US$45.5 million (R$107 million) for the project in September 2001. The first plant (Alto Jauru – 20MW) started operations in the first semester of 2003. The second plant (Indiavai – 26MW) was expected to start operations in July 2003. The third plant (Ombreiras – 30MW) was expected to be operation in May 2004. In June 2003, BK Energia signed a PPA to sell the energy produce by all three plants to Centrais Eletricas do Mato Grosso (Cemat). |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Mato Grosso |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Commercial, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Foz do Chapeco Hydroelectric Power Plant
- Atiaia Energia S.A.
