logo

Araraquara Transmissora de Energia

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In February 2009, Araraquara Transmissora de Energia S.A., a subsidiary of the Spanish company CYMI Holding S.A., was awarded in a competitive bidding process the contract to build and operate two 15 Km transmission lines and a substation located in the state of Sao Paulo. CYMI Holding belonged to the Spanish group ACS. Besides CYMI Holding S.A., three other groups took part in the contest: Consor

Status
Prospective
Sector
Commercial, Hydro, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Araraquara Transmissora de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Araraquara Transmissora de Energia” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In February 2009, Araraquara Transmissora de Energia S.A., a subsidiary of the Spanish company CYMI Holding S.A., was awarded in a competitive bidding process the contract to build and operate two 15 Km transmission lines and a substation located in the state of Sao Paulo. CYMI Holding belonged to the Spanish group ACS. Besides CYMI Holding S.A., three other groups took part in the contest: Consorcio Madeira Transmissao (CTEEP 51%; FURNAS 24,5%; CIA HIDRO ELÉTRICA DO SÃO FRANCISCO 24,5%); Consorcio TME Trans (NEOENERGIA 34%; ALUPAR 22%; CEMIG 22%; EMPRESA AMAZONENSE DE TRANSMISSÃO 22%); and Camargo Correa S.A. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. CYMI Holding S.A. presented the lowest offer, a total value of US$ million (BRL 15.5 million), 29.5% the ceiling set by the regulatory agency. The contract was signed in February 2009, and the sponsor created the company Araraquara Transmissora de Energia S.A. to lead the project during the 30-year contract period. As of 2009, the sponsor committed to invest US$ 114.7 million (BRL 229.4 million) in the transmission line. The construction works commenced in March 2009, but financial closure was only achieved in November 2010, when the sponsor was granted a US$ 42 million (BRL 84 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works started in mid-2010 and should be concluded by February 2012. In August 2012, commercial operations commenced. In October 2012, the Chinese company State Grid Corporation acquired two transmission lines that belonged to Cymi Holding.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Hydro, Power Generation (CCGT), Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project