Araraquara Transmissora de Energia
Sector: Commercial • Location: Brazil
Source: World Bank Group
In February 2009, Araraquara Transmissora de Energia S.A., a subsidiary of the Spanish company CYMI Holding S.A., was awarded in a competitive bidding process the contract to build and operate two 15 Km transmission lines and a substation located in the state of Sao Paulo. CYMI Holding belonged to the Spanish group ACS. Besides CYMI Holding S.A., three other groups took part in the contest: Consor
- Status
- Prospective
- Sector
- Commercial, Hydro, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Araraquara Transmissora de Energia
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In February 2009, Araraquara Transmissora de Energia S.A., a subsidiary of the Spanish company CYMI Holding S.A., was awarded in a competitive bidding process the contract to build and operate two 15 Km transmission lines and a substation located in the state of Sao Paulo. CYMI Holding belonged to the Spanish group ACS. Besides CYMI Holding S.A., three other groups took part in the contest: Consorcio Madeira Transmissao (CTEEP 51%; FURNAS 24,5%; CIA HIDRO ELÉTRICA DO SÃO FRANCISCO 24,5%); Consorcio TME Trans (NEOENERGIA 34%; ALUPAR 22%; CEMIG 22%; EMPRESA AMAZONENSE DE TRANSMISSÃO 22%); and Camargo Correa S.A. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. CYMI Holding S.A. presented the lowest offer, a total value of US$ million (BRL 15.5 million), 29.5% the ceiling set by the regulatory agency. The contract was signed in February 2009, and the sponsor created the company Araraquara Transmissora de Energia S.A. to lead the project during the 30-year contract period. As of 2009, the sponsor committed to invest US$ 114.7 million (BRL 229.4 million) in the transmission line. The construction works commenced in March 2009, but financial closure was only achieved in November 2010, when the sponsor was granted a US$ 42 million (BRL 84 million) loan from BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works started in mid-2010 and should be concluded by February 2012. In August 2012, commercial operations commenced. In October 2012, the Chinese company State Grid Corporation acquired two transmission lines that belonged to Cymi Holding. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Hydro, Power Generation (CCGT), Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
