logo

Arauco Sucuriu

Sector: Mass Transit • Location: Brazil

Source: International Finance Corporation (IFC)

Project
Active

IFC is considering a loan to support Celulosa Arauco y Constitución (Arauco) for the construction and operation of the Sucuriú Project, an industrial pulp plant in Inocência, Mato Grosso do Sul, Brazil. The facility will have an annual production capacity of 3.5 million tons of short-fiber pulp, supported by 400,000 hectares of eucalyptus plantations, with operations expected to begin in late 2027

Project Information FAQ

Project Information

4 Q
The project “Arauco Sucuriu” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

IFC is considering a loan to support Celulosa Arauco y Constitución (Arauco) for the construction and operation of the Sucuriú Project, an industrial pulp plant in Inocência, Mato Grosso do Sul, Brazil. The facility will have an annual production capacity of 3.5 million tons of short-fiber pulp, supported by 400,000 hectares of eucalyptus plantations, with operations expected to begin in late 2027. The project includes a 91 km transmission line connecting the plant to the Ilha Solteira substation and a 47 km railway link to the Rumo Logística network, facilitating pulp distribution. The plant will incorporate high-efficiency processing units, including a recovery boiler, lime kilns, an evaporation plant, and a crystallization plant. Thegasification system will feature two 92 MW units, while a biomass boiler with a 200 t/h capacity will contribute to energy self-sufficiency. The facility is expected to generate 400 MW of clean energy, with 220 MW available for sale through Brazil’s National Interconnected System (SIN). With the support of specialized external consultants, the project has developed an Environmental & Social Impact Assessment (ESIA) titled “Estudo De Impacto Ambiental (EIA/RIMA) - Fábrica de Celulose Branqueada em Inocência – MS” dated “October 2023” to address E&S risks, impacts and mitigations for the project. The ESIA was submitted for approval to the Mato Grosso do Sul Environmental Institute (IMASUL). The ESIA should notbe taken as an indication that IFC has completed its review of the potential investment. Upon completion of the E&S Due Diligence process, an Environmental and Social Review Summary (ESRS) will be prepared and published on this website.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data