Araya I
Source: International Finance Corporation (IFC)
Administradora de Fondos de Inversiones Universal, S.A. () (“AFI Universal”) is a fund manager based in the Dominican Republic (DR) with a total of 11 funds since inception, including real estate funds dedicated to housing developments in the DR for the low-income, touristic and urban segments. Grupo BAK, S.R.L. () (“Grupo BAK” or the “Compa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pending |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Administradora de Fondos de Inversiones Universal, S.A. (https://www.afiuniversal.com.do/) (“AFI Universal”) is a fund manager based in the Dominican Republic (DR) with a total of 11 funds since inception, including real estate funds dedicated to housing developments in the DR for the low-income, touristic and urban segments. Grupo BAK, S.R.L. (https://grupobricket.com/) (“Grupo BAK” or the “Company”), is local developer. IFC’s proposed financing entails an up to US$20m senior secured loan to finance the development of the Araya Phase 1 housing project (“Araya” or the “Project”), located in Bavaro, in partnership with AFI Universal and Grupo BAK, (the “Sponsors”). The Sponsors will create a trust to manage the Project, with responsibility for architectural design, construction, and property management assigned to Grupo BAK, (including E&S management). The Project will consist of 462 apartments across 77 three-story buildings, plus 1,000 square meters of ground floor retail facilities. Onsite sports and recreation facilities will be included for use by residents. Grupo BAK is responsible for architectural design and construction, as well as property management until the development is fully completed, (which will coincide with the full repayment of the IFC loan). The Company purchased the land in December 2022, (6.5 hectares), and works so far have been limited to geotechnical, topographical, and environmental studies. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
